Improvement Plan For The Process Of Leakage Electric Core

Publish Time: 2025-05-29
1. Net weight of the original turning blank: 4.9g for turning at both ends. Net weight of the blank after cold heading: 3.22g, 1.89g less than the original process blank, and a 34% reduction in material cost.

2. The original turning part is directly replaced by the clamping equipment, and the quality is more stable.



3. The original turning capacity is 18 pieces/minute. After cold heading, the capacity is 35 pieces/minute, and the efficiency is increased by 94%.

×